Construction & physical-industry AI · Built through Good Combinator

Understand the value model before using the estimate.

The FL1Ai estimator is an illustrative planning tool, not a savings forecast or performance guarantee.

Illustrative planning estimator

Expose the value pool, then replace assumptions with evidence.

Adjust the four planning inputs. Values use the formulas and limitations documented below and are not a performance guarantee.

Planning inputs
80
12
50
$15M

Assumptions: $2,500 planning cost per avoidable RFI cycle, 30% candidate reduction, 0.9% rework exposure with an 18% addressable share, a team-size safety proxy, and a 0.45% schedule-risk proxy with an 18% addressable share.

Illustrative annual value pool

RFI and document cycle value
$720,000
Rework exposure value
$291,600
Safety and field review leverage
$180,000
Schedule-risk visibility
$145,800

Potential annual value pool$1,337,400

Formula disclosure

Every displayed value comes from a visible assumption.

The model is intentionally simple so a partner can challenge, replace, or remove each input.

RFI

Document-cycle value

Monthly questions × $2,500 planning cost × 30% candidate reduction × 12 months.

Rework

Addressable exposure

Active projects × average project value × 0.9% rework exposure × 18% addressable share.

Safety

Review-leverage proxy

Field and project team size ÷ 50 × $180,000. This is a planning proxy, not an incident reduction claim.

Schedule

Visibility proxy

Active projects × average project value × 0.45% schedule-risk proxy × 18% addressable share.

Interpretation

Do not confuse a value pool with captured value.

The estimator frames where diligence may be worthwhile; it cannot establish a budget, ROI promise, investment return, or performance guarantee.

Exclusions

  • Implementation cost, integration cost, model operation, change management, and internal review time.
  • Overlap among RFI, rework, safety, and schedule categories.
  • Probability that a candidate opportunity can be captured in practice.
  • Contract, insurance, legal, safety, regulatory, and project-specific constraints.
  • Any causal claim that AI produced a measured business result.

Worked example

The default inputs—80 monthly questions, 12 active projects, 50 team members, and $15 million average project value—produce an illustrative combined value pool of $1,337,400. The figure is not a savings forecast. A real pilot replaces every assumption with authorized project records, a baseline, implementation cost, and reviewed attribution.